GO Transit trip guide

Kitchener GO to Union Station

Kitchener line · 11 stations in between · no change of train.

Kitchener GO is on GO Transit's Kitchener line, which ends at Union Station: a train from Kitchener GO passes 11 stations on the way in (Guelph Central, Acton, Georgetown, Mount Pleasant, Brampton Innovation District, Bramalea, Malton, Etobicoke North, Weston, Mount Dennis and Bloor) with no change of train. On a weekday 11 direct trains are scheduled to Union, and the scheduled ride is about 99 min (94 to 110 min).

Not every train stops at every station on the way, and a trip may run only part of the line, so the live plan is the one to trust for a given departure: it shows the train, the stops it makes, and the connection at either end.

Kitchener GO to Union at a glance

Stations in between
11
Change of train
None: Union is the end of the line
Scheduled ride to Union
about 99 min (94 to 110 min)
Scheduled ride from Union
about 106 min (97 to 112 min)
Direct trains on weekdays
11 to Union, 11 from Union
First / last train to Union
5:15 a.m. / 8:48 p.m.
First / last train from Union
8:49 a.m. / 10:34 p.m.
Trains skipping a station
10 of 11 to Union
Weekend trains
To Union: 3 on Saturday, 3 on Sunday. From Union: 3 on Saturday, 3 on Sunday.

All times and ride lengths are scheduled, from the GO timetable for Tuesday, September 29, 2026 (weekend trains: October 17 and 18, 2026); live times are in the trip planner. More about the station is on the Kitchener GO station page.

Stations from Kitchener GO to Union

Union Station to Kitchener GO

Going the other way, board a Kitchener line train at Union. It passes the same 11 stations in reverse order, Bloor first and Guelph Central last, before Kitchener. Plan Union to Kitchener GO.

Connections at each end

At Kitchener GO

At Union Station

← Every GO trip to Union

Frequently asked questions

How do I get from Kitchener GO to Union Station?
Take a GO train on the Kitchener line toward Union. Union is where the line ends, so there is no change of train; the line passes 11 stations on the way in (Guelph Central, Acton, Georgetown, Mount Pleasant, Brampton Innovation District, Bramalea, Malton, Etobicoke North, Weston, Mount Dennis and Bloor). If a trip runs only part of the line, the live plan shows the connection.
How do I get from Union Station to Kitchener GO?
Board a Kitchener line train at Union heading out along the line. It passes Bloor, Mount Dennis, Weston, Etobicoke North, Malton, Bramalea, Brampton Innovation District, Mount Pleasant, Georgetown, Acton and Guelph Central before Kitchener.
How many stations are between Kitchener GO and Union Station?
11 stations: Kitchener is station 12 out of Union on the Kitchener line. Not every train stops at every station, so the live plan lists the stops for your departure.
How long is the GO train from Kitchener GO to Union Station?
The scheduled ride is about 99 min (94 to 110 min) across the 11 direct weekday trains; 10 of 11 skip at least one station on the way. From Union back to Kitchener it is about 106 min (97 to 112 min), scheduled. Weekday times are from the GO timetable for Tuesday, September 29, 2026; the live plan has today's departures.
When is the first and last train from Kitchener GO to Union Station?
On weekdays toward Union, the first scheduled train leaves at 5:15 a.m. and the last at 8:48 p.m. From Union, the first scheduled train leaves at 8:49 a.m. and the last at 10:34 p.m. Direct trains scheduled to Union on the weekend of October 17 and 18, 2026: 3 on Saturday and 3 on Sunday. Weekday times are from the GO timetable for Tuesday, September 29, 2026; the live plan has today's departures.
Are Kitchener GO and Union Station accessible?
Yes. Both Kitchener and Union are listed as fully accessible stations.
Can I plan Kitchener GO to Union with live status?
Yes. Reroute plans GO trips with live line status from Metrolinx, and connects the train to the TTC, local buses, driving or walking in the same itinerary.

One app for the whole trip.

Every way across the GTA, ranked in one list. No account needed.