TTC station guide

Kennedy

First & last trains, connections and delay risk for Kennedy.

Line 2 subway platform at Kennedy station with the new panels on the wall, replacing the old vertical red slats.
Photo: Dillan Payne · CC BY-SA 4.0, via Wikimedia Commons

Kennedy is the busiest interchange in the east end, where Line 2 meets Line 5 Eglinton Crosstown and connects directly to GO Transit for riders heading further out along the regional rail corridors. It used to be a triple subway interchange too, with the now-closed Line 3 Scarborough RT terminating here before that line shut down in 2023, and the station's layout still reflects having handled three separate services at once. That combination of subway, light rail, and regional rail makes Kennedy one of the more consequential stops for anyone travelling between Scarborough and the rest of the city. Reroute treats it as a genuine decision point, checking whether the GO connection actually beats staying on the subway depending on where a trip starts and ends.

Kennedy at a glance

First train (weekday)
5:40 a.m.
Last train (weekday)
2:16 a.m. (next day)
Accessible
Yes

First & last train

 First trainLast train
Weekday5:40 a.m.2:16 a.m. (next day)
Weekend5:40 a.m.2:18 a.m. (next day)

Connections

Next stops

Where it is

Map of the area around Kennedy station, with the station marked.
© Mapbox © OpenStreetMap

Accessibility

Kennedy is a fully accessible station.

Delay risk

Line 2 Bloor–Danforth's incident rate runs about 1.0× the GTA-wide baseline, built from public TTC delay history — a comparison of incident rates, not the odds your specific trip is delayed.

Reroute's incident index is built from the public TTC delay log; Line 5 Eglinton doesn't have enough logged history for a fair comparison.

← Back to TTC route planner

Be first across the city.

Join the waitlist and get the first invite when Reroute launches in the GTA.